Common questions Stainesai
The cost can be affected by the size of the area, the condition of the existing plaster, and the complexity of the repair.
The drying time for patch and repair plastering is typically 1-2 days, depending on the room's temperature and humidity.
Materials commonly used include bonding coats, plaster for floating, and skim coats to achieve a smooth finish.
No, patch and repair plastering is not a regulated trade. Always confirm with your tradesperson before work begins.