Bathroom Floor Tiling

Tile a bathroom floor. Subfloor checked and prepared, tiles laid with appropriate adhesive, grouted and sealed.

Typical cost
£1,600 — £2,600
Typical duration
2-3 days
Scope type
flexible

Typical tasks

Extras & additional works

Based on a standard 20m² bathroom floor, costs may increase if complex patterns or high-end materials are chosen.

Common questions  Stainesai
The price can be affected by the size of the bathroom, the type of tiles chosen, and any additional preparation work required.
Bathroom floor tiling typically takes 2-3 days, including preparation, installation, and drying time.
Tilers usually supply the adhesive and grout, but homeowners often choose and supply their own tiles.
Regular cleaning and occasional resealing of grout lines can help maintain the appearance and durability of tiled floors. Always confirm with your tradesperson before work begins.